classical 88.7 | public radio 89.5

Oklahoma's Largest Load Continues Its Trip

Jackie Myers

The giant  gas plant demethanizer is on the roll again after spending the night ay Glenpool. The tower is over 180-feet long. Manufactured in Broken Arrow, it is destined for a gas processing plant in Colorado.

It weighs over a half-a-million pounds and is being pulled on a specialized trailer by two large trucks in front and pushed by one at the rear.

It made its way from Broken Arrow , west on 101st Street. It then turned south on Memorial, closing that intersection for a half hour. From there, it headed south across the Arkansas River bridge at Bixby. It then turned west on 151st in Bixby to Glenpool.

  • Facebook
  • Twitter
  • LinkedIn
  • Email